Thu 8/31 | Intro | | Lab 1 |
Tue 9/5 | Bitmaps and grids. | | Lab 2 |
Thu 9/7 | Data models (grids, TINs and topological structures for TINs). | | Lab 3 |
Tue 9/12 | Aspect, slope and hillshading. | | Lab 4 |
Thu 9/14 | Sea level rise. | Project1: Visualizing terrains | Lab 5 |
Tue 9/19 | More sea-level rise. | | Lab 6 |
Thu 9/21 | Drainage and flow accumulation. | | |
Tue 9/26 | class cancelled - work on project 2 | Project2: Sea level rise | |
Thu 9/28 | class cancelled - work on project 2 | | |
Tue 10/3 | Drainage on flat areas. | | Lab 8 |
Thu 10/5 | Watersheds and watershed hierarchy. Viewsheds (1). | | |
Thu 10/12 | Viewsheds (2) | Project3: Drainage and flooding | |
Tue 10/17 | Viewsheds (3) | | |
Thu 10/19 | Line simplification algorithms | | |
Tue 10/24 | Terrain simplification algorithms | | |
Thu 10/26 | class cancelled - work on project 3 | Project4: Viewsheds | |
Tue 10/31 | Terrain simplification | | |
Thu 11/2 | Space filling curves | | |
Tue 11/7 | Space filling curves. | | Lab (OpenMP) |
Thu 11/9 | OpenMP. | | |
Tue 11/14 | OpenMP | | |
Thu 11/16 | Working with Lidar data | | |
Tue 11/21 | Working with Lidar data | | |
| Thanksgiving break | | |
Tue 11/28 | Working with Lidar data | | |
Thu 11/30 | Working with Lidar data | | |
Tue 12/5 | Projects | | |
Thus 12/7 | Projects | | |